Solar prices last checked 20 November 2026 from Pakistani market listings. How we calculate
Solar system prices by size (on-grid, Tier-1 panels)
System
Estimated total
Per watt
3 kW
Rs 215,000 – 300,500
Rs 72–100
5 kW
Rs 335,000 – 467,500
Rs 67–94
6 kW
Rs 400,000 – 551,000
Rs 67–92
8 kW
Rs 530,000 – 708,000
Rs 66–89
10 kW
Rs 650,000 – 865,000
Rs 65–87
15 kW
Rs 955,000 – 1,252,500
Rs 64–84
What's included
Panels — current market rate per watt for the grade you choose. See today's panel prices.
Inverter — typical range for the nearest standard size; premium brands sit at the top of the range.
Balance of system — mounting structure, DC/AC cables, breakers, surge protection, earthing and labour (Rs 6–10 per watt).
Batteries — lithium (LiFePO4) at Rs 30,000–45,000 per kWh.
Net billing — an estimate for the meter and paperwork, plus a reported Rs 1,000/kW concurrence fee that may no longer apply to systems of 25 kW or below (see the guide on net billing).
Before you sign a quote
Ask for the exact panel model and a datasheet, and check it's A-grade.
Confirm the inverter's warranty is handled by an official distributor in Pakistan.
Ask for galvanised structure and the DC cable size in writing.
Get at least three itemised quotes.
Frequently asked questions
What is the price of a 5 kW solar system in Pakistan?
With Tier-1 N-type panels and an on-grid inverter, about Rs 335,000 – 467,500 installed, before batteries and net billing fees. Prices change weekly with panel rates and the dollar.
What is the price of a 10 kW solar system?
Roughly Rs 650,000 – 865,000 for an on-grid system with Tier-1 panels.
Why do quotes vary so much?
Panel brand and grade (A-grade vs B-grade), inverter brand, structure quality (galvanised vs painted iron), cable size, earthing and warranty all change the price. Always ask for an itemised quote.
Do I need to pay anything to the DISCO for net billing?
Possibly. A non-refundable concurrence fee of Rs 1,000 per kW was reported, but NEPRA's August 2026 amendment (S.R.O. 1330(I)/2026) says systems of 25 kW or below no longer need the Authority's concurrence. Costs for the bidirectional meter, application and inspection also vary by DISCO. Ask your DISCO what applies.